相似文献/References:
[1]张翼.上部结构-基础-地基共同工作数值解法[J].华侨大学学报(自然科学版),1999,20(4):377.[doi:10.11830/ISSN.1000-5013.1999.04.0377]
Zhang Yi.Numerical Solution of the Joint Action of Upper Structure and Foundation and Soil[J].Journal of Huaqiao University(Natural Science),1999,20(3):377.[doi:10.11830/ISSN.1000-5013.1999.04.0377]
[2]王世平,王全凤.大跨度RC天桥施工全过程的力学分析[J].华侨大学学报(自然科学版),2001,22(2):178.[doi:10.3969/j.issn.1000-5013.2001.02.016]
Wang Shiping,Wang Quanfeng.Mechanical Analysis of a Long Span RC Overpass during the Whole Course of Its Construction[J].Journal of Huaqiao University(Natural Science),2001,22(3):178.[doi:10.3969/j.issn.1000-5013.2001.02.016]
[3]张新红.求解对流占优方程的不完全插值有限元法[J].华侨大学学报(自然科学版),2002,23(3):322.[doi:10.3969/j.issn.1000-5013.2002.03.022]
Zhang Xinhong.Incomplete Interpolation-Based Finite Element Method for Solving Convection-Dominated Equation[J].Journal of Huaqiao University(Natural Science),2002,23(3):322.[doi:10.3969/j.issn.1000-5013.2002.03.022]
[4]邱文龙,林福泳.用C_n群解梁弯曲问题[J].华侨大学学报(自然科学版),2005,26(1):62.[doi:10.3969/j.issn.1000-5013.2005.01.016]
Qiu Wenlong,Lin Fuyong.Solving the Bending of Beam by Using C_n Group[J].Journal of Huaqiao University(Natural Science),2005,26(3):62.[doi:10.3969/j.issn.1000-5013.2005.01.016]
[5]李士军,郝艳华.约束方程的分区网格划分法[J].华侨大学学报(自然科学版),2006,27(2):170.[doi:10.3969/j.issn.1000-5013.2006.02.016]
Li Shijun,Hao Yanhua.The Regional Meshing Method Based on Constraint Equation[J].Journal of Huaqiao University(Natural Science),2006,27(3):170.[doi:10.3969/j.issn.1000-5013.2006.02.016]
[6]闫洁.渗流铸造过程中流场温度场的数值模拟[J].华侨大学学报(自然科学版),2007,28(1):11.[doi:10.3969/j.issn.1000-5013.2007.01.004]
YAN Jie.Numerical Simulation of the Flow-Thermal Field in the Process of Penetration Casting[J].Journal of Huaqiao University(Natural Science),2007,28(3):11.[doi:10.3969/j.issn.1000-5013.2007.01.004]
[7]陈朝慰,彭大文,林志平.分阶段施工合成箱梁湿接缝的合理宽度分析[J].华侨大学学报(自然科学版),2007,28(3):308.[doi:10.3969/j.issn.1000-5013.2007.03.022]
CHEN Chao-wei,PENG Da-wen,LIN Zhi-ping.Analysis of the Rational Width of Wet-Joint in the Composite Box Beam Built by Construction Stages[J].Journal of Huaqiao University(Natural Science),2007,28(3):308.[doi:10.3969/j.issn.1000-5013.2007.03.022]
[8]杨长洲,童昕,黄庆专,等.分支电路压电阻尼减振技术的电路参数优化[J].华侨大学学报(自然科学版),2007,28(4):341.[doi:10.3969/j.issn.1000-5013.2007.04.002]
YANG Chang-zhou,TONG Xin,HUANG Qing-zhuan,et al.Parameter Optimization of Piezoelectric Damping Vibration Technology with Shunted Circuits[J].Journal of Huaqiao University(Natural Science),2007,28(3):341.[doi:10.3969/j.issn.1000-5013.2007.04.002]
[9]刘飞,李元齐,沈祖炎.新型冷弯薄壁型钢屋架结构承载力分析[J].华侨大学学报(自然科学版),2009,30(6):698.[doi:10.11830/ISSN.1000-5013.2009.06.0698]
LIU Fei,LI Yuan-qi,SHEN Zu-yan.Analysis on Load-Carrying Capacity of New Cold-Formed Thin-Walled Steel Roof Truss[J].Journal of Huaqiao University(Natural Science),2009,30(3):698.[doi:10.11830/ISSN.1000-5013.2009.06.0698]
[10]陈亚军,郭力群,徐芳超.基坑延深开挖复合支护结构有限元模拟[J].华侨大学学报(自然科学版),2013,34(3):316.[doi:10.11830/ISSN.1000-5013.2013.03.0316]
CHEN Ya-jun,GUO Li-qun,XU Fang-chao.Finite Element Simulation of Composite Supporting Structure for Deepening Excavation of Foundation Pit[J].Journal of Huaqiao University(Natural Science),2013,34(3):316.[doi:10.11830/ISSN.1000-5013.2013.03.0316]