参考文献/References:
[1] 张友兵,唐涛.基于有色Petri网的CTCS-3级列控系统RBC切换的建模与形式化分析[J].铁道学报,2012,34(7):49-55.DOI:10.3969/j.issn.1001-8360.2012.07.008.
[2] LIU Jintao,TANG Tao,ZHAO Lin,et al.Functional safety analysis method for CTCS level 3 based on hybrid automata[C]//IEEE 15th International Symposium on Object/Component/Service-Oriented Real-Time Distributed Computing Workshops.Shenzhen:IEEE Computer Society,2012:7-12.DOI:10.1109/ISORCW.2012.12.
[3] TROWITZSCH J,ZIMMERMANN A.Using UML state machines and petri nets for the quantitative investigation of ETCS[C]//Proceedings of the 1st International Conference on Performance Evaluation Methodolgies and Tools.New York:ACM,2006:34.DOI:10.1145/1190095.1190138.
[4] Lü Jidong,TANG Tao.Formal modeling and analysis of RBC subsystem in CTCS level 3 using UPPAAL[C]//WRI World Congress on Computer Science and Information Engineering.Los Angeles:IEEE Press,2009:49-53.DOI:10.1109/CSIE.2009.49.
[5] ALUR R,ETESSAMI K,YANNAKAKIS M.Inference of message sequence charts[J].IEEE Transactions on Software Engineering,2003,29(7):623-633.DOI:10.1109/TSE.2003.1214326.
[6] GERMAN R,KELLING C,ZIMMERMANN A,et al.Time NET: A toolkit for evaluating non-Markovian stochastic petri nets[C]//International Workshop on Petri Nets and Performance Models.Durham:IEEE Press,1995:210-211.DOI:10.1109/PNPM.1995.524333.
[7] 王建.基于随机Petri网的高铁列控系统C2/C3等级转换过程建模及仿真[D].成都:西南交通大学,2015.
[8] 梁楠,王海峰.基于SPN的CTCS-3级列控系统RBC实时性能分析[J].铁道学报,2011,33(2):67-71.DOI:10.3969/j.issn.1001-8360.2011.02.011.
[9] 康仁伟,王俊峰,吕继东.基于UPPAAL的高铁列控系统等级转换过程建模与验证[J].北京交通大学学报,2012,36(6):63-67.DOI:10.3969/j.issn.1673-0291.2012.06.012.
[10] 曹源.高速铁路列车运行控制系统的形式建模与验证方法研究[D].北京:北京交通大学,2011.
[11] 赵晓宇,程瑞军,程雨,等.基于HUML的列控系统形式化建模与参数分析方法[J].铁道学报,2016,38(11):80-87.DOI:10.3969/j.issn.1001-8360.2016.11.012.
[12] 刘金涛,唐涛,赵林,等. 基于UML模型的CTCS-3级列控系统功能安全分析方法[J]. 铁道学报,2013,35(10):59-66.DOI:10.3969/j.issn.1001-8360.2013.10.009.
[13] 赵林,唐涛,刘金涛,等.基于UML扩展机制的列控系统建模方法研究[J].铁道学报,2012,34(12):64-70.DOI:10.3969/j.issn.1001-8360.2012.12.010.
[14] 吴建锋,汪毅.UML的供应链订单管理系统分析与设计[J].华侨大学学报(自然科学版),2003,24(2):213-217.DOI:10.3969/j.issn.1000-5013.2003.02.019
[15] 张友兵.基于CPN的CTCS-3级列控系统RBC切换的建模与分析[D].北京:北京交通大学,2010:2-4.
[16] 韩福荣.基于时间有色Petri网的联锁软件的形式化建模与分析[D].上海:同济大学,2007:1-9.
[17] 李伟.基于有色Petri网的无线闭塞中心子系统切换建模与验证[D].北京:北京交通大学,2009:40-53.
[18] 徐田华,赵红礼,唐涛.基于有色Petri网的ETCS无线通信可靠性分析[J].铁道学报,2008,30(1):38-42.DOI:10.3321/j.issn:1001-8360.2008.01.007.