参考文献/References:
[1] 王玉娜,谢梦平,李晓婷.建筑工业化多主体系统风险网络研究综述[J].工程管理学报,2017,31(6):29-33.DOI:10.13991/j.cnki.jem.2017.06.006.
[2] MAO Chao,SHEN G Q,PAN Wei,et al.Major barriers to off-site construction: The developer’s perspective in China[J].Journal of Management in Engineering,2015,31(3):04014043.DOI:10.1061/(ASCE)ME.1943-5479.0000246.
[3] LUO Lizi,MAO Chao,SHEN Liyin,et al.Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system: A case study from China[J].Engineering Construction & Architectural Management,2015,22(6):622-643.DOI:10.1108/ECAM-04-2014-0048.
[4] ARASHPOUR M,ABBASI B,ARASHPOUR M,et al.Integrated management of on-site, coordination and off-site uncertainty: Theorizing risk analysis within a hybrid project setting[J].International Journal of Project Management,2017,35(4):647-655.DOI:10.1016/j.ijproman.2017.02.016.
[5] LI C Z C,HONG Jingke,FAN Cheng,et al.Schedule delay analysis of prefabricated housing production: A hybrid dynamic approach[J].Journal of Cleaner Production,2018,195:1533-1545.DOI:10.1016/j.jclepro.2017.09.066.
[6] FRANCISCO J C.Risk control measures in payment systems[J].Quarterly Review of Economics and Finance,2009,49(1):1-25.DOI:10.1016/j.qref.2007.06.001.
[7] 袁剑波,刘苇,刘伟军.工程建设项目风险对策应用[J].中外公路,2006,26(1):14-16.DOI:10.3969/j.issn.1671-2579.2006.01.004.
[8] 李永海.考虑风险关联的项目风险应对的案例决策分析方法[J].系统工程,2016,34(6):136-143.
[9] SUMIT D,MUKHERJEE S K.Developing a risk management matrix for effective project planning: An empirical study[J].Project Management Journal,2001,32(2):45-57.
[10] MARCELINO-SÁDABA S,PÉREZ-EZURDIA A,LAZCANO A M E,et al.Project risk management methodology for small firms[J].International Journal of Project Management,2014,32(2):327-340.DOI:10.1016/j.ijproman.2013.05.009.
[11] KUJAWSKI E.Selection of technical risk responses for efficient contingencies[J].Systems Engineering,2002,5(3):194-212.DOI:10.1002/sys.10025.
[12] ZHANG Yao,FAN Zhiping.An optimization method for selecting project risk response strategies[J].International Journal of Project Management,2014,32(3):412-422.DOI:10.1016/j.ijproman.2013.06.006.
[13] SEYEDHOSEINI S M,NOORI S,HATEFI M A.An integrated methodologyfor assessment and selection of the project risk response actions[J].Risk Analysis,2009,29(5):752-763.DOI:10.1111/j.1539-6924.2008.01187.x.
[14] ZHANG Yao.Selecting risk response strategies considering project risk interdependence[J].International Journal of Project Management,2016,34(5):819-830.DOI:10.1016/j.ijproman.2016.03.00.
[15] CHERAGHI E,KHALILZADEH M,SHOJAEI S,et al.A mathematical model to select the risk response strategies of the construction projects: Case study of Saba tower[J].Procedia Computer Science,2017,121:609-616.DOI:10.1016/j.procs.2017.11.080.
[16] FAN Zhiping,LI Yonghai,ZHANG Yao.Generating project risk response strategies based on CBR: A case study[J].Expert Systems with Applications,2015,42(6):2870-2883.DOI:10.1016/j.eswa.2014.11.034.
[17] LIANG Xin,SHEN G Q P,BU Shanshan.Multiagent systems in construction: A ten-year review[J].Journal of Computing in Civil Engineering,2016,30(6):04016016.DOI:10.1061/(ASCE)CP.1943-5487.0000574.
相似文献/References:
[1]董娜,弓成,熊峰.装配式建筑施工建筑信息模型应用成熟度评价[J].华侨大学学报(自然科学版),2020,41(1):50.[doi:10.11830/ISSN.1000-5013.201907029]
DONG Na,GONG Cheng,XIONG Feng.Maturity Evaluation of Building Information Modeling Applications in Prefabricated Building Construction[J].Journal of Huaqiao University(Natural Science),2020,41(2):50.[doi:10.11830/ISSN.1000-5013.201907029]
[2]秦旋,张赵鑫,朱倩影.采用文献计量可视化知识图谱分析的装配式建筑预制供应链管理[J].华侨大学学报(自然科学版),2021,42(6):709.[doi:10.11830/ISSN.1000-5013.202011029]
QIN Xuan,ZHANG Zhaoxin,ZHU Qianying.Prefabricated Building Precast Supply Chain Management of Visual Knowledge Map Using Bibliometric Method[J].Journal of Huaqiao University(Natural Science),2021,42(2):709.[doi:10.11830/ISSN.1000-5013.202011029]