参考文献/References:
[1] USAMI T,GE H B.Ductility of concrete-filled steel box column under cyclic loading[J].Journal of Structural Engineering,1994,120(7):2021-2040.DOI:10.1061/(ASCE)0733-9445(1994)120:7(2021).
[2] GE H B,USAMI T.Cyclic tests of concrete-filled steel box columns[J].Journal of Structural Engineering,1996,122(10):1169-1177.DOI:10.1061/(ASCE)0733-9445(1996)122:10(1169).
[3] USAMI T,GE H B,SAIZUKA K.Behavior of partially concrete-filled steel bridge piers under cyclic and dynamic loading[J].Journal of Constractional Steel Research,1998,41(2):121-136.DOI:10.1016/S0143-974X(97)00007-2.
[4] GE H B,SUSANTHA K A S,SATAKE Y,et al.Seismic demand predictions of concrete-filled steel box columns[J].Engineering Structures,2003,25(3):337-345.DOI:10.1016/S0141-0296(02)00162-1.
[5] 王跃东,高圣彬.内填部分混凝土箱形截面钢桥墩的滞回性能研究[J].四川建筑科学研究,2012,38(1):14-18.DOI:10.3969/j.issn.1008-1933.2012.01.004.
[6] SUSANTHA K A S,AOKI T,KUMANO T,et al.Applicability of low-yield-strength steel for ductility improvement of steel bridge piers[J].Engineering Structures,2005,27(7):1064-1073.
[7] ISMAIL R E S,FATHELBAD F A,ELDIN H,et al.Numerical investigations on dynamic performance of stiffened box steel bridge piers[J].International Journal of Steel Structures,2012,12(2):139-155.
[8] GE H B,USAMI T.Cyclic tests of concrete-filled steel box columns[J].Journal of Structural Engineering,1996,122(10):1169-1177.DOI:10.1061/(ASCE)0733-9445(1996)122:10(1169).
[9] 吉伯海,高圣彬.钢桥抗震与损伤控制设计指南(基础篇)[M].南京:河海大学出版社,2008.
[10] CHEN Shengjin,CHEN Jie.Steel bridge columns with pre-selected plastic zone for seismic resistance[J].Thin-Walled Structures,2009,47(1):31-38.DOI:10.1016/j.tws.2008.04.007.
[11] TAO Zhong,HAN Linhai.Behaviour of fire-exposed concrete-filled steel tubular beam column repaired with CFRP wraps[J].Thin-Walled Structures,2007,45(1):63-76.DOI:10.1016/j.tws.2006.11.004.