参考文献/References:
[1] WALKER E D. Planning and controlling multiple, simultaneous, independent projects in a resource constrained environment [D]. Georgia:University of Georgia, 1998.
[2] 张云波. 工程项目工期延误原因分析 [J]. 华侨大学学报(自然科学版), 2003(4):369-373.doi:10.3969/j.issn.1000-5013.2003.04.007.
[3] PALOMO J, RIOS I D, RUGGERI F. Dynamic models with expert input with applications to project cost forecasting [R]. Madrid:Universidad Rey Juan Carlos, 2004.
[4] JESUS P, DAVID R I, FABRIZIO R. Modeling external risks in project management [J]. Risk Analysis, 2007(4):961-978.doi:10.1111/j.1539-6924.2007.00935.x.
[5] EDEN C T, WILLIAMS F, ACKERMAN. The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D & D) in major projects [J]. Journal of the Operational Research Society, 2000(3):291-300.
[6] HOWICK S, EDDENC. The impact of disruption and delay when compressing large projects:Going for incentives [J]. Journal of the Operational Research Society, 2001(1):29-34.doi:10.1057/palgrave.jors.2601045.
[7] WILLIAMS T. Seeking optimum project duration extensions [J]. Journal of the Operational Research Society, 1999(5):460-467.
[8] WILLIAMS T, EDEN C, ACKERMAN F. The effects of design changes and delay on project costs [J]. Journal of the Operational Research Society, 1995(7):809-818.
[9] MANUEL L, PILAR L, PREZ A. Minimizing weighted tardiness of jobs with stochastic interruptions in parallel machines [J]. European Journal of Operational Research, 2000(2):444-457.doi:10.1016/S0377-2217(99)00495-6.
[10] 汪嘉旻, 孙永广, 吴宗鑫. 收益激励的优化与最优工期的选择 [J]. 系统工程, 2000(3):5-10.doi:10.3969/j.issn.1001-4098.2000.03.002.
[11] DECLRP R F, HEBERT J E, VERDINI W A. Nonlinear time/cost tradeoff models in project management [J]. Computers & Industrial Engineering, 1995(2):219-229.
[12] LI Heng, CAO J N, LOVE P E D. Using machine learning and GA to solve time-cost tradeoff problems [J]. Journal of Construction Engineering and Management, 1999(5):347-353.doi:10.1061/(ASCE)0733-9364(1999)125:5(347).
[13] 柴国荣, 洪兆富, 亓文国. 基于进度优化的大型项目激励机制模型 [J]. 系统工程, 2008(1):102-105.doi:10.3969/j.issn.1001-4098.2008.01.018.
[14] 张静文, 徐渝, 何正文. 多模式资源约束型折现流时间-费用权衡项目进度 [J]. 系统工程, 2005(5):17-21.doi:10.3969/j.issn.1001-4098.2005.05.004.
相似文献/References:
[1]矫立超.采用多因素模糊矩阵算法的数值模拟与工程风险仿真诊断[J].华侨大学学报(自然科学版),2016,37(5):591.[doi:10.11830/ISSN.1000-5013.201605013]
JIAO Lichao.Numerical Simulation and Engineering Risk Simulation Diagnosis Using Multi-Factor Fuzzy Matrix Algorithm[J].Journal of Huaqiao University(Natural Science),2016,37(6):591.[doi:10.11830/ISSN.1000-5013.201605013]