参考文献/References:
[1] 国务院办公厅.关于大力发展装配式建筑的指导意见[J].建材发展导向,2016,14(24):14-16.
[2] 郭正兴,朱张峰,管东芝.装配整体式混凝土结构研究与应用[M].南京:东南大学出版社,2018.
[3] WANG Zhaojing,HU Hao,GONG Jie.Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components[J].Automation in Construction,2018,86(4):69-80.DOI:10.1016/j.autcon.2017.10.026.
[4] 管文玉,凌卫青.基于文献计量的数字孪生研究可视化知识图谱分析[J].计算机集成制造系统,2020,26(1):18-27.DOI:10.13196/j.cims.2020.01.002.
[5] 丁学东.文献计量学基础[M].北京:北京大学出版社,1992.
[6] CHAN W T, HU Hao.An application of genetic algorithms to precast production scheduling[J].Computers and Structures,2001,79(17):1605-1616.DOI:10.1016/S0045-7949(01)00036-0.
[7] HU Hao,CHAN W T.Production scheduling for precast plants using a flow shop sequencing model[J].Journal of Computing in Civil Engineering,2002,16(3):165-174.DOI:10.1061/(ASCE)0887-3801(2002)16:3(165).
[8] LEU S,HWANG S.GA-based resource-constrained flow-shop scheduling model for mixed precast production[J].Automation in Construction,2002,11(4):439-452.DOI:10.1016/S0926-5805(01)00083-8.
[9] KO C H,WANG Shufan.GA-based decision support systems for precast production planning[J].Automation in Construction,2010,19(7):907-916.DOI:10.1016/j.autcon.2010.06.004.
[10] KO C H,WANG S F.Precast production scheduling using multi-objective genetic algorithms[J].Expert Systems with Applications,2011,38(7):8293-8302.DOI:10.1016/j.eswa.2011.01.013.
[11] KHALILI A,CHUA D K.Integrated prefabrication configuration and component grouping for resource optimization of precast production[J].Journal of Construction Engineering and Management,2014,140(2):4013051-4013052.DOI:10.1061/(ASCE)CO.1943-7862.0000798.
[12] WANG Zhaojing,HU Hao,GONG Jie.Modeling worker competence to advance precast production scheduling optimization[J].Journal of Construction Engineering and Management,2018,144(11):4018091-4018098.DOI:10.1061/(ASCE)CO.1943-7862.0001556.
[13] WANG Zhaojing,HU Hao.Improved precast production-scheduling model considering the whole supply chain[J].Journal of Computing in Civil Engineering,2017,31(4):4017011-4017013.DOI:10.1061/(ASCE)CP.1943-5487.0000667.
[14] YANG Zhitian,MA Zhiliang,WU Song.Optimized flowshop scheduling of multiple production lines for precast production[J].Automation in Construction,2016,72:321-329.DOI:10.1016/j.autcon.2016.08.021.
[15] WANG Zhaojing,HU Hao.Dynamic response to demand variability for precast production rescheduling with multiple lines[J].International Journal of Production Research,2018,56(16):5386-5401.DOI:10.1080/00207543.2017.1414970.
[16] LI S H A,TSERNG H P,YIN S Y L,et al.Aproduction modeling with genetic algorithms for a stationary precast supply chain[J].Expert Systems with Applications,2010,37(12):8406-8416.DOI:10.1016/j.eswa.2010.05.040.
[17] KO C H.An integrated framework for reducing precast fabrication inventory[J].Journal of Civil Engineering and Management,2010,16(3):418-427.DOI:10.3846/jcem.2010.48.
[18] KONG Liulin,LI Heng,LUO Hanbin,et al.Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates[J].Automation in Construction,2017,81:34-43.DOI:10.1016/j.autcon.2017.03.016.
[19] KONG Liulin,LI Heng,LUO Hanbin,et al.Sustainable performance of just-in-time(JIT)management in time-dependent batch delivery scheduling of precast construction[J].Journal of Cleaner Production,2018,193:684-701.DOI:10.1016/j.jclepro.2018.05.037.
[20] ANVARI B,ANGELOUDIS P,OCHIENG W Y.A multi-objective GA-based optimisation for holistic manufacturing, transportation and assembly of precast construction[J].Automation in Construction,2016,71:226-241.DOI:10.1016/j.autcon.2016.08.007.
[21] YIN S Y L,TSERNG H P,WANG J C,et al.Developing a precast production management system using RFID technology[J].Automation in Construction,2009,18(5):570-577.DOI:10.1016/j.autcon.2009.02.004.
[22] WANG Zhaojing,HU Hao,ZHOU Wei.RFID Enabled knowledge-based precast construction supply chain[J].Computer-Aided Civil and Infrastructure Engineering,2017,32(6):499-514.DOI:10.1111/mice.12254.
[23] WANG Zhaojing,HU Hao,GONG Jie.Simulation based multiple disturbances evaluation in the precast supply chain for improved disturbance prevention[J].Journal of Cleaner Production,2018,177:232-244.DOI:10.1016/j.jclepro.2017.12.188.
[24] ARASHPOUR M,BAI Y,ARANDA-MENA G,et al.Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction[J].Automation in Construction,2017,84:146-153.DOI:10.1016/j.autcon.2017.08.032.
[25] LUO Lizi,CHAO Mao,SHEN Liyin,et al.Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system: A case study from China[J].Engineering Construction and Architectural Management,2015,22(6):622-643.
[26] ARASHPOUR M,WAKEFIELD R,BLISMAS N,et al.Optimization of process integration and multi-skilled resource utilization in off-site construction[J].Automation in Construction,2015,50:72-80.DOI:10.1016/j.autcon.2014.12.002.
[27] ARASHPOUR M,WAKEFIELD R,ABBASI B,et al.Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources[J].Architectural Engineering and Design Management,2017,1(1):1-14.DOI:10.1080/17452007.2017.1302406.
[28] LI C Z,HONG Jingke,XUE Fan,et al.Schedule risks in prefabrication housing production in Hong Kong: A social network analysis[J].Journal of Cleaner Production,2016,134:482-494.DOI:10.1016/j.jclepro.2016.02.123.
[29] LI C Z,SHEN G Q,XU Xiaoxiao,et al.Schedule risk modeling in prefabrication housing production[J].Journal of Cleaner Production.2017,153:692-706.DOI:10.1016/j.jclepro.2016.11.028.
[30] LI C Z,XU Xiaoxiao,SHEN G Q,et al.A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong[J].Journal of Cleaner Production,2018,185:366-381.DOI:10.1016/j.jclepro.2018.02.308.
[31] MOSTAFA S,CHILESHE N.Application of discrete-event simulation to investigate effects of client order behaviour on off-site manufacturing performance in Australia[J].Architectural Engineering and Design Management,2018,14(1/2):139-157.DOI:10.1080/17452007.2017.1301367.
[32] XUE Hong,ZHANG Shoujian,SU Yikun,et al.Effect of stakeholder collaborative management on off-site construction cost performance[J].Journal of Cleaner Production,2018,184:490-502.DOI:10.1016/j.jclepro.2018.02.258.
[33] 刘义川,刘贵文,傅晏,等.装配式建筑预制构件生产调度文献综述[J].项目管理技术,2019,17(4):20-25.
[34] MARICHELVAM M K,PRABAHARAN T,YANG X S.Improved cuckoo search algorithm for hybrid flow shop scheduling problems to minimize makespan[J].Applied Soft Computing Journal,2014,19:93-101.DOI:10.1016/j.asoc.2014.02.005.
[35] MARICHELVAM M K,TOSUN ?,GEETHA M.Hybrid monkey search algorithm for flow shop scheduling problem under makespan and total flow time[J].Applied Soft Computing,2017,55:82-92.DOI:10.1016/j.asoc.2017.02.003.
[36] 秦旋,房子涵,张赵鑫.混合共生生物搜索算法求解置换流水车间调度问题[J].浙江大学学报(工学版),2020,54(4):712-721.DOI: 10.3785/j.issn.1008-973X.2020.04.010.
[37] 王艳,丁宇.动态柔性作业车间优化调度与决策方法[J].系统仿真学报,2020,32(11):2073-2083.DOI:10.16182/j.issn1004731x.joss.20-0732
[38] 周圆圆,陈辉.基于Witness仿真的紧急订单插单问题研究[J].物流工程与管理,2021,43(4):20-22.DOI:10.3969/j.issn.1674-4993.2021.04.007.
[39] 李珍萍,李腾飞.考虑交货期的生产运输联合优化问题研究[J].数学的实践与认识,2021,51(1):265-276.DOI:10.16301/j.cnki.cn12-1204/f.2020.06.046.
[40] 徐立云,程赞,宓宏,等.基于改进变邻域搜索算法的成型机分批重调度优化[J].同济大学学报(自然科学版),2020,48(10):1460-1469.DOI:10.11908/j.issn.0253-374x.19406.