参考文献/References:
[1] 张旷成,李继民.杭州地铁湘湖站“08.11.15”基坑坍塌事故分析[J].岩土工程学报,2010,32(增刊1):338-342.
[2] 石钰锋,阳军生,白伟,等.紧邻铁路偏压基坑围护结构变形与内力测试分析[J].岩石力学与工程学报,2011,30(4):826-833.
[3] 姚爱军,张新东.不对称荷载对深基坑围护变形的影响[J].岩土力学,2011,32(增刊2):378-382,388.DOI:10.16285/j.rsm.2011.s2.031.
[4] XU Changjie,XU Yuanlei,SUN Honglei,et al.Characteristics of braced excavation under asymmetrical loads[J].Mathematical Problems in Engineering,2013(11):1-12.DOI:10.1155/2013/452534.
[5] 朱有奇,周云东,赵元海,等.非对称深基坑变形规律现场监测[J].水利与建筑工程学报,2013,11(6):157-161.DOI:10.3969/j.issn.1672-1144.2013.06.033.
[6] 魏纲,俞国骅,余剑英,等.临近地铁隧道的非对称基坑受力及变形性状分析[J].施工技术,2017,46(增刊1):22-27.
[7] OU Xuefeng,ZHANG Xuemin,FU Jinyang,et al.Cause investigation of large deformation of a deep excavation support system subjected to unsymmetrical surface loading[J].Engineering Failure Analysis,2020,107:104202.DOI:10.1016/j.engfailanal.2019.104202.
[8] 舒进,丁春林,张思源.临河地铁车站深基坑变形规律研究[J].华东交通大学学报,2011,28(5):57-62.
[9] 郑刚,宗超,曾超峰,等.非对称基坑分步降水开挖引起的围护结构变形性状[J].岩土工程学报,2013,35(增刊2):550-554.
[10] 徐长节,成守泽,蔡袁强,等.非对称开挖条件下基坑变形性状分析[J].岩土力学,2014,35(7):1929-1934.DOI:10.16285/j.rsm.2014.07.035.
[11] 雷崇.临河地铁深基坑开挖在大偏压作用下的支护结构性状研究[J].铁道标准设计,2017,61(5):130-134.DOI:10.13238/j.issn.1004-2954.2017.05.028.
[12] 方焘,刘春,郭俊,等.土体宽度非对称基坑变形特性分析[J].华东交通大学学报,2019,36(6):99-105.DOI:10.16749/j.cnki.jecjtu.2019.06.015.
[13] LIU Shouhua,YANG Junsheng,FU Jinyang,et al.Performance of a deep excavation irregular supporting structure subjected to asymmetric loading[J].International Journal of Geomechanics,2019,19(7):0915007.1-0915007.13.DOI:10.1061/(ASCE)GM.1943-5622.0001468.
[14] GUO Panpan,GONG Xiaonan,WANG Yixian.Displacement and force analyses of braced structure of deep excavation considering unsymmetrical surcharge effect[J].Computers and Geotechnics,2019,113:103102.DOI:10.1016/j.compgeo.2019.103102.
[15] 孙武斌.地铁车站偏压基坑围护结构变形影响因素研究[J].重庆交通大学学报(自然科学版),2020,39(4):86-91.DOI:10.3969/j.issn.1674-0696.2020.04.15.
[16] 喻军,鲁嘉,龚晓南.考虑围护结构位移的非对称基坑土压力分析[J].岩土工程学报,2012,34(增刊1):24-27.
[17] 徐长节,殷铭,胡文韬.非对称开挖基坑支撑式围护结构解析解[J].岩土力学,2017,38(8):2306-2312.DOI:10.16285/j.rsm.2017.08.019.
[18] 范晓真,许海明,徐长节,等.非对称开挖砂性土基坑刚性支护结构解析解[J].上海交通大学学报,2020,54(4):397-405.DOI:10.16183/j.cnki.jsjtu.2020.04.008.
[19] YOO C.Behavior of braced and anchored walls in soils overlying rock[J].Journal of Geotechnical and Geoenvironmental Engineering,2001,127(3):225-233.DOI:10.1061/(ASCE)1090-0241(2001)127:3(225).
[20] LEUNG E Y,NG C W W.Wall and ground movements associated with deep excavations supported by cast in situ wall in mixed ground conditions[J].Journal of Geotechnical and Geoenvironmental Engineering,2007,133(2):129-143.DOI:10.1061/(ASCE)1090-0241(2007)133:2(129).
[21] 徐中华,王建华,王卫东.上海地区深基坑工程中地下连续墙的变形性状[J].土木工程学报,2008(8):81-86.DOI:10.15951/j.tmgcxb.2008.08.013.
[22] 夏雄,邓妍,陆天阳,等.常州市某地铁站深基坑支撑轴力监测与分析[J].南京工程学院学报(自然科学版),2019,17(1):27-30.DOI:10.13960/j.issn.1672-2558.2019.01.006.
[23] 王宁波,陈志川.深基坑混凝土支撑轴力监测数据分析与研究[J].石家庄铁道大学学报(自然科学版),2018,31(增刊1):115-117.DOI:10.13319/j.cnki.sjztddxxbzrb.2018.S1.29.
[24] 鲍树峰,邱青长,罗彦,等.土岩组合基坑施工监控技术研究[J].岩石力学与工程学报,2014,33(增刊1):3270-3276.DOI:10.13722/j.cnki.jrme.2014.s1.095.