参考文献/References:
[1] 门峰,姬升启.基于模糊集与灰色关联的改进FMEA方法[J].工业工程与管理,2008,13(2):55-59.
[2] 张得平.SHB公司PFMEA的应用及改进研究[D].上海:华东理工大学,2013.
[3] 孙璐璐,周晓军,奚立峰.基于FMEA的污水排放设备维护策略[J].工业工程与管理,2007,12(6):50-54.
[4] DINMOHAMMADI F,SHAFIEE M.A fuzzy-FMEA assessment approach for offshore wind turbines[J].International Journal of Prognostics and Health Management,2013,4(S2):59-68.
[5] SELLAPPAN N,PALANIKUMAR K.Modified prioritization methodology for risk priority number in failure mode and effect analysis[J].International Journal of Applied Science and Technology,2013,3(4):27-36.
[6] 盛精,王君,罗善明.采用模糊理论的零部件工艺PFMEA评估[J].华侨大学学报(自然科学版),2015,36(6):609-614.
[7] BOWLES J B,PELAEZ C E.Fuzzy logic prioritization of failures in a system failure modes, effects and criticality analysis[J].Reliability Engineering and System Safety,1995,50(2):203-213.
[8] 杜晗恒,彭翀.基于模糊TOPSIS的FMEA方法[J].北京航空航天大学学报,2016,42(2):368-374.
[9] 王浩伦,徐翔斌,甘卫华.基于三角模糊软集的FMEA风险评估方法[J].计算机集成制造系统,2015,21(11):3054-3062.
[10] 安相华,于靖博,蔡卫国.基于混合多属性决策和关联分析的模糊粗糙FMEA评估方法[J].计算机集成制造系统,2016,22(11):2613-2621.
[11] 耿秀丽,张永政.基于犹豫模糊集的改进FMEA风险评估方法[J].计算机集成制造系统,2017,23(2):340-348.