参考文献/References:
[1] 韩尚宇,李红,洪宝宁.道路工程施工阶段工期风险计算方法与应用[J].岩土工程学报,2013(增刊1):264-268.
[2] HANNO H,KAWADA N.Construction of the long-distance urban tunnel with large-section shield tunnel method: Metropolitan expressway central circular shinjuku route[J].コンクリート工学=Concrete Journal,2003,41(1):38-42.
[3] 洪坤,赵梦琦,钟登华,等.基于极差分析法的引水隧洞施工工期多因素灵敏度分析[J].水利水电技术,2015,46(1):65-69.
[4] PENNINGTON P E T W,RICHARDS P E D P.Understanding uncertainty: Assessment and management of geotechnical risk in tunnel constructio[C]//GeoRisk 2011: Geotechnical Risk Assessment and Management.Atlanta:[s.n.],2011:552-559.DOI:10.1061/41183(418)54.
[5] WANG Sizhuan.The new subway construction risk management practice and research[J].Journal of Surgical Research,2013,186(2):494.DOI:10.1016/j.jss.2013.11.057.
[6] 王天梁.地铁明挖车站工期影响因素及工期策划[J].中国科技信息,2016(15):33-34.DOI:10.3969/j.issn.1001-8972.2016.15.009.
[7] BAO Haijun,PENG Yi,ABLANEDO-ROSAS J H,et al.An alternative incomplete information bargaining model for identifying the reasonable concession period of a BOT project[J].International Journal of Project Management,2015,33(5):1151-1159.DOI:10.1016/j.ijproman.2014.12.004.
[8] 蒋慧杰,吴慧博,夏立明,等.高速公路施工进度风险评价[J].重庆大学学报(社会科学版),2012,18(2):87-93.DOI:10.3969/j.issn.1008-5831.2012.02.014.
[9] 项勇,任宏.工程项目工期风险因素影响分析: 基于贝叶斯网络理论和非叠加原理[J].技术经济与管理研究,2015(2):3-7.DOI:10.3969/j.issn.1004-292X.2015.02.001.
[10] KECI J.A user-oriented implementation of risk breakdown structure in construction risk management[J].土木工程与建筑:英文版,2014,144(5):529-537.
[11] 向鹏成,常微.基于HHM的跨区域重大工程项目风险因素识别[J].世界科技研究与发展,2015,37(1):67-72.DOI:10.16507/j.issn.1006-6055.2015.01.014.
[12] STEURER J.The Delphi method: An efficient procedure to generate knowledge[J].Skeletal Radiology,2011,40(8):959-961.DOI:10.1007/s00256-011-1145-z.