参考文献/References:
[1] PHARES B M,FARIS A S,GREIMANN L,et al.Integral bridge abutment to approach slab connection[J].Journal of Bridge Engineering,2013,18(2):179-181.
[2] 乔华.桥头搭板设计方法及技术参数的研究[D].西安:长安大学,2011:1-2.
[3] RANDY D,MARTIN M,ASCE T H.Structural design and construction issues of approach slabs [J].Practice Periodical on Structural Design and Construction,2013,18(1):12-20.
[4] WANG Tianli,LI Qingning,HU Dalin.The review about a new type of bridge structure-semi-integral abutment jointless bridge[C]//Proceedings of the International Conference of Architecture and Technology(I).Xi’an:Trans Tech Publications LTD,2011:72-75.
[5] 金晓勤,邵旭东.半整体式全无缝桥梁研究[J].土木工程学报,2009,42(9):68-73.
[6] 占雪芳,邵旭东.半整体式无缝桥中带预压缝的配筋接线路面温降效应[J].土木工程学报, 2011,44(11):74-78.
[7] 张荣.弹性地基梁计算模型研究[D].北京:北京交通大学,2007:1-2.
[8] 吴艳红,郭春霞,梁志刚.考虑纵向摩阻时弹性地基梁的弯曲[J].西安建筑科技大学学报(自然科学版),2013,6(3):379-382.
[9] 王智德.搭板设计参数优化解决桥头跳车的研究及应用[D].武汉:武汉理工大学,2011:10-11.
[10] 宋娃丽,史文革,王凤岐.桥头搭板的受力计算[J].河北工业大学学报(自然科学版),1999,28(4):95-98.