[1]肖朝昀,胡向东.人工地层冻结有限厚度冻土帷幕自然解冻规律[J].华侨大学学报(自然科学版),2010,31(6):674-679.[doi:10.11830/ISSN.1000-5013.2010.06.0674]
 XIAO Zhao-yun,HU Xiang-dong,Natural Thawing of Frozen Soil with Limited Thickness by Artificial Ground Freezing[J].Journal of Huaqiao University(Natural Science),2010,31(6):674-679.[doi:10.11830/ISSN.1000-5013.2010.06.0674]
点击复制

人工地层冻结有限厚度冻土帷幕自然解冻规律()
分享到:

《华侨大学学报(自然科学版)》[ISSN:1000-5013/CN:35-1079/N]

卷:
第31卷
期数:
2010年第6期
页码:
674-679
栏目:
出版日期:
2010-11-20

文章信息/Info

Title:
Natural Thawing of Frozen Soil with Limited Thickness by Artificial Ground Freezing
文章编号:
1000-5013(2010)06-0674-06
作者:
肖朝昀胡向东
华侨大学土木工程学院; 同济大学土木工程学院地下建筑与工程系; 同济大学岩土及地下工程教育部重点实验室
Author(s):
XIAO Zhao-yun1 HU Xiang-dong2 3
1.College of Civil Engineering, Huaqiao University, Quanzhou 362021, China; 2.Department of Geotechnical Engineering, School of Civil Engineering, Tongji University, Shanghai 200092, China; 3.Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092, China
关键词:
人工冻结技术 自然解冻 人工地层 冻土帷幕 相变 解冻速度
Keywords:
natural thawing artificial ground freezing frozen soil phase change average thawing velocity
分类号:
TU445
DOI:
10.11830/ISSN.1000-5013.2010.06.0674
文献标志码:
A
摘要:
采用数值方法分析单排和多排冻结管形成的冻土帷幕自然解冻规律,以及冻土帷幕完成解冻所需的时间及平均解冻速度随厚度的变化.研究结果表明,对于有限厚度冻土帷幕自然解冻,相变所需的时间占主要部分.单排冻结管形成的冻土帷幕,相变所需的时间占整个解冻时间的90%左右; 多排冻结管形成的冻土帷幕,相变所需的时间占整个解冻时间的随排间厚度的增加,从80%下降至60%.此外,单排管冻结形成的冻土帷幕自然解冻,其解冻时间和平均解冻速度与厚度大致呈抛物线关系; 而多排管冻结形成的冻土帷幕自然解冻,其解冻时间和平均解冻速度与厚度大致呈线性关系.
Abstract:
Natural thawing of frozen soil with limited thickness by artificial ground freezing using numeric method is studied.The temperature field of the frozen soil and the thawing time,as well as the average thawing velocity against the thickness of frozen soil wall formed by single-row or multi-row of freeze tubes are analyzed.For the natural thawing of frozen soil with limited thickness,phase change time dominates the entire thawing time.The phase change time of frozen soil by single-row freeze tubes is 90% of the entire thawing time; for multi-row freeze tubes,the phase change time is 80%~60% varied with the thickness of the frozen soil.It is shown that approximate parabola relationships exist between the thawing time,as well as thawing velocity against the thickness of frozen soil wall formed by single-row freezing,and approximate linear relationships exist in the frozen soil wall formed by multiple-row freezing.

参考文献/References:

[1] 周晓敏, 王梦恕, 陶龙光. 北京地铁隧道水平冻结和暗挖施工模型试验与实测研究 [J]. 岩土工程学报, 2003(6):676-679.doi:10.3321/j.issn:1000-4548.2003.06.006.
[2] 仇培云, 岳丰田, 杨国祥. 复杂地质条件下隧道联络通道冻结工程实录 [J]. 地下空间与工程学报, 2005(6):979-982.doi:10.3969/j.issn.1673-0836.2005.06.044.
[3] 肖朝昀, 胡向东, 张庆贺. 四排局部冻结法在上海地铁修复工程中的应用 [J]. 岩土力学, 2006, (z2):300-304.
[4] 秦一雄, 胡向东, 尚新民. 人工冻结技术在上海地下工程中的应用 [J]. 隧道建设, 2007, (z2):349-353.doi:10.3969/j.issn.1672-741X.2007.z2.071.
[5] 高志勤, 山本义章. 土壤冻结工法(Ⅳ):一次元の解冻 [J]. 冷冻(日本), 1964, (439):1-12.
[6] 陈明雄, 傅德明. 上海软土地层浅覆土盾构隧道冻结加固模拟试验研究 [J]. 地下工程与隧道, 1995(3):2-7.
[7] 周真云. 冻结法施工快速解冻研究及施工实践 [J]. 西部探矿工程, 2003, (10):84.doi:10.3969/j.issn.1004-5716.2003.10.044.
[8] 沈季良, 崔云龙, 王介峰. 建井工程手册:第4卷 [M]. 北京:煤炭工业出版社, 1984.
[9] 肖朝昀, 胡向东. 人工地层冻结冻土自然解冻与强制解冻实测分析 [J]. 长江大学学报:自然科学版(理工卷), 2009(3):92-95.
[10] 奥齐西克 M N, 俞昌铭. 热传导 [M]. 北京:高等教育出版社, 1983.
[11] 翁家杰. 井巷特殊施工 [M]. 北京:煤炭工业出版社, 1991.
[12] 肖朝昀, 胡向东, 张庆贺. 多排管局部冻结冻土壁温度场特征 [J]. 岩石力学与工程学报, 2007, (z1):2694-2700.doi:10.3321/j.issn:1000-6915.2007.z1.015.
[13] 刘曾荣. 一类Stefan问题的渐进解 [J]. 应用数学和力学, 1983(6):801-808.
[14] HARRIS J S. Ground freezing in practice [M]. London:Thomas Telford Ltd, 1995.
[15] AIMMERMAN W B J, 中仿科技公司. COMSOL Multiphysics有限元法多物理场建模与分析 [M]. 北京:人民交通出版社, 2007.

备注/Memo

备注/Memo:
国家自然科学基金资助项目(50578120)
更新日期/Last Update: 2014-03-23